Home > News
Pretreatment and electrocoating – Building a sound foundation with Ecopaint WetSystem
Addtime:2020-3-27

With the Ecopaint WetSystem product family Dürr designs, integrates and implements high-performance, top-quality wet systems with standardized components and fully coordinated conveyor systems.


The first station in the painting process is pretreatment, where bodies coming through from the body shop are cleaned, degreased and usually phosphated to prepare them for subsequent coating. The second process step is electro-coating, which applies an anti-corrosive primer by dipping the car body in an electrically conductive bath. To ensure that also the inside is properly treated, the car body is immersed in the process bath. Preatreatment and electro-coating with Ecopaint WetSystem is based on innovative, flexible technologies.


From the planning stage on, we focus on creating highly flexible wet systems with space-saving layouts and low operating expenditure. Cross-process approaches reveal untapped optimization potentials of energy consumption and coating quality. By continuously filtering the process liquids, our systems reduce both chemicals and water consumption. Our efficient RoDip® rotational dip process and optimized anode control system EcoDC MACS are just two tried-and-tested examples.


More info: 

[Print]

 China Electroplating Association

 China Surface Engineering Association Painting of Branch

 Chongqing Surface Engineering Association 

 Chongqing Surface Engineering Technology Society 

 Wise Exhibition (Guangdong) Co.,Ltd. 

 Chongqing Painting Industry Association 

 

 Chongqing Electroplating Industry Association 

 Sichuan Province Surface Engineering Industry Association


USA Powder Coating Institute


Singapore Surface Engineering Association


Metal Finishers' Association of India


Brazilian Surface Finishing Association

Concurrent Events
Pre-registration
 
 
  © Wise Exhibition    About Us  |  Contact Us  |  Favorites